Removed archived audit snapshots and superseded plans:
- BOOT-PROCESS-* (3 audit files from 2026-05)
- COMPREHENSIVE-FIX-AND-IMPROVEMENT + FINAL (superseded by IMPROVEMENT-PLAN)
- DEVICE-INIT, GRAPHICAL-BOOT, GREETER-LOGIN (old assessments)
- IOMMU-SPEC, SCHEDULER-REVIEW, BUILD-TOOLS, VFAT, ZSH (superseded)
Active plans remain in local/docs/. Archived dir now has 10 files.
Removed from archived/:
- USB v1/v2 (superseded by active v3 plan)
- GRUB, KERNEL-IPC, RELIBC-IPC, SCRIPT-BEHAVIOR (duplicates of active plans)
- BOOT-PROCESS-AUDIT, COMPREHENSIVE-DRIVER-AUDIT (outdated 2026-05 snapshots)
- C7-STATUS, 0.2.5-GRAPHICS, CHANGELOG-DRIVER, PROFILE-MATRIX (obsolete status docs)
Active copies remain in local/docs/ for all plans.
python312: Added --disable-test-modules to host build configure flags.
The host build (needed as dev-dependency for cross-compile) was
trying to compile test modules (_testmultiphase, xxlimited, etc.)
which fail on this system. The cross-compile already had this flag.
icu: Added --disable-tools to cross-compile configure flags. The ICU
data tools (genrb, derb) try to link against cross-compiled static
libraries, causing C++ vtable linker errors (undefined reference
to vtable for UTF16CollationIterator). Tools are built in the host
step; cross-compile only needs the libraries.
Combined with zsh --srcdir, base staging mkdir, and netstack fix,
these unblock the redbear-mini build.
WIFI-IMPLEMENTATION-PLAN: iwlwifi driver complete (3,368 LOC).
MVM, Minstrel, thermal, WoWLAN, TLV, power mgmt all done.
Hardware validation pending.
WAYLAND-IMPLEMENTATION-PLAN: Wayland subsystem builds.
Qt6 Wayland, Mesa EGL+GBM+GLES2, KWin building.
Compositor validation pending.
IMPROVEMENT-PLAN already marked resolved (38/38 done).
MASTER plan updated earlier with status tables.
Three resolved plans now marked as historical records with
resolution banners. Plans retained for context — not deleted
per project policy.