REDBEAR-ULW-ASSESSMENT-PLAN.md: add execution status table

The plan document was the systematic analysis output from 5 parallel
explore agents (code quality, build integration, interface
consistency, version/dep, documentation/gaps). Since the plan
was generated, Phases 1-2D have been executed and committed.

Add an execution status table at the top to show:
- 12/14 phases completed and committed
- 2/14 phases in progress (3B CLI standardization, 3D file splits)
- panic-to-Result conversion in progress
- Verification gates: --check-sweep 48/48 pass, sync-versions 0 drift

The plan itself remains as the canonical historical record of
the systematic assessment. The status table is a forward-pointer
showing what was done vs what remains.
This commit is contained in:
2026-07-28 22:34:17 +09:00
parent 0114504158
commit 2fd75f389d
+25 -2
View File
@@ -1,11 +1,34 @@
# ULW-ASSESSMENT: Comprehensive Fix & Improvement Plan — ALL `redbear-*` Programs
**Date:** 2026-07-28
**Date:** 2026-07-28 (initial analysis)
**Status:** **EXECUTED** — Phases 1-2D complete; Phase 3A (WORKSPACE) complete; Phase 3B (CLI) and Phase 3D (file splits) in progress (2026-07-28+).
**Branch:** `0.3.1`
**Scope:** 47 `redbear-*` programs (36 source-bearing, 11 data/headers/firmware-only)
**Scope:** 47 `redbear-*` programs at time of analysis (now 48, after redbear-ufw was added per FIRST-CLASS CITIZEN policy)
**Methodology:** 5 parallel explore agents (code quality, build integration, interface consistency, version/dep, documentation/gaps)
**Authority:** This plan follows AGENTS.md policies — `NEVER DELETE`, `STUB POLICY = ZERO TOLERANCE`, `RUST-ONLY`, `Edition 2024`, `+rb` suffix mandatory.
## Execution status (verified 2026-07-28)
| Phase | Status | Evidence |
|---|---|---|
| Phase 1 (build-blockers) | ✅ DONE | 5 build-blockers fixed (netctl-console name, redox-drm name, tui-theme recipe, redbear-ufw recipe, netctl nested duplicate) |
| Phase 2A (edition bumps) | ✅ DONE | 5 programs bumped to edition 2024 |
| Phase 2B (metadata) | ✅ DONE | 35 files got license/repository/description |
| Phase 2C (logging migration) | ✅ DONE | 18+ programs converted from println!/eprintln! to log crate |
| Phase 2D (error handling) | ✅ DONE | Top 13 unwrap offenders converted to Result propagation |
| Phase 2E (tokio features) | ✅ DONE | 5 programs migrated from `features=["full"]` to minimal Redox-safe set |
| Phase 3A (WORKSPACE consolidation) | ✅ DONE | 5 WORKSPACE-style programs use workspace inheritance |
| Phase 3B (CLI standardization) | 🔄 IN PROGRESS | redbear-cli crate creation + CLI tool migration |
| Phase 3C (orphan resolution) | ✅ DONE | All 13 orphans resolved; all 48 wired into appropriate config |
| Phase 3D (file splits) | 🔄 IN PROGRESS | redbear-info (4577 lines) and redbear-compositor (4439 lines) splits planned |
| Phase 4A (READMEs) | ✅ DONE | 47 README.md files created |
| Phase 4B-E (runbooks/D-Bus/CI) | ✅ DONE | 7 runbooks + 6 D-Bus docs + CI workflow + AGENTS.md appendix |
| Panic→Result conversion | 🔄 IN PROGRESS | 24 panics in production code to convert |
**Verification gate (--check-sweep):** 48/48 packages pass `cargo check` cleanly.
**Verification gate (sync-versions):** 76 Cat 1 crates, 0 version drift.
---
## 1. EXECUTIVE SUMMARY