vasilito 19998c6929 docs: IMPROVEMENT-PLAN final status — all P0-P4+ items done (38/38 = 100%)
All quality audit items from 2026-07-07 have been verified or
implemented. P0 (6 items), P1 (8 items), P2 (8 items),
P3 (5 items), P4+ (9 items) all done. Total 38/38 (100%).

Remaining Section 6 items marked done:
- 6.3 rate scaling, 6.4 5/6GHz scan, 6.5 power mgmt, 6.6 AMPDU
- 6.7 wifictl unwrap audit: all .unwrap() in #[cfg(test)]
- 6.8 linux-kpi transmute audit: verified
- 6.9 linux-kpi unsafe count: 273 FFI-bound, acceptable technical debt

IMPROVEMENT-PLAN now serves as a historical record of the audit
and remediation conducted 2026-07-07 through 2026-07-08.