Commit Graph

6 Commits

Author SHA1 Message Date
vasilito 068a1ca63e bootloader: rebase onto upstream 1.0.0, sync firmware-loader version
Bootloader fork rebase:
- Base changed from 0.1.0 pre-patched archive to upstream 1.0.0 tag (c7eeb9f)
- Applied 0001-redbear-local-forks.patch (Cargo.toml crate path redirects)
- Applied fix-uefi-alloc-panic.patch equivalents (4 panic!() -> graceful
  error handling in src/main.rs)
- Applied P5-live-preload-cap-1gib.patch (1 GiB cap on live image preload)
- Skipped: P0 GPT partition scan (requires new module + integration),
  P1 timeout/default-resolution, P2 live preload guard (subsumed by
  panic fixes + cap), P3 live image safe read, P4 large ISO boot,
  redox.patch — to be applied in dedicated rebase session.

firmware-loader/Cargo.toml: version 0.1.0 -> 0.3.0 (sync with other
Red Bear custom crates which are at 0.3.0).

fork-upstream-map.toml: bootloader back from PENDING_REBASE to 1.0.0
since the partial rebase matches upstream 1.0.0 content.

fork-upstream-map.toml: base restored to 'main' tracked (was correctly
tracked by build-redbear.sh).
2026-07-11 09:47:59 +03:00
vasilito 311a96bc94 qt/qtsvg: apply CVE-2026-6210 patch (heap-overflow in QSvgMarker::drawHelper)
Cherry-picked from Qt upstream (commit e488f852fa18c2afc2842a88eff8f66ad4105a45).
Original patch source:
https://download.qt.io/official_releases/qt/6.11/CVE-2026-6210-qtsvg-6.11.diff

Fix: Test types of nodes before downcasting them. A bad cast in
QSvgMarker::drawHelper led to endless recursion resulting in a heap
overflow. While fixing that, another similar case was also fixed.
2026-07-11 01:36:28 +03:00
vasilito 48021ef39c diffutils: add cookbook_make and cookbook_make_install steps
The diffutils recipe only ran cookbook_configure but never actually
compiled or installed anything, leaving stage.tmp empty (4K). This
caused redbear-mini to fail with a 4.0K INCOMPLETE stage and no
diff/diff3 binaries in the final image.

Add the missing make and make install steps, matching the pattern
used by other autotools recipes (bison, findutils, etc.).
2026-07-11 00:04:31 +03:00
vasilito b8aac3c9bc D7: editor multi-cursor support
Add secondary_cursors field to Editor with insert_char_multi,
delete_back_multi, delete_forward_multi methods. Right-to-left
processing ensures position shifts don't corrupt earlier insertions.

7 new tests: add/clear, all_positions, insert, delete_back,
delete_forward, unicode, duplicate-add.
2026-07-05 22:29:19 +03:00
vasilito 89e6f29b22 local: commit full local tree state 2026-06-18 20:46:44 +03:00
vasilito 950edaa65f cub: full AUR package manager + Phase 1-5 native build tools
cub redesign (local/recipes/system/cub/):
- AUR RPC v5 client (serde_json) with search/info
- ~/.cub/ user-local recipe/source/repo storage
- Enhanced PKGBUILD parser: optdepends, .SRCINFO, split packages, 19 linuxism patterns
- Recipe generation: host: prefix on dev-deps, shallow_clone, cargopath, installs, optional-packages
- Dependency resolver: scans build errors for missing commands/headers/libs/pkgconfig, maps to packages
- Dependency installation: checks installed packages, fetches AUR deps, interactive prompt
- ~110 Arc→Redox dependency mappings
- ratatui TUI: search, info, install, build, query views
- 14 Arch-style CLI switches (-S/-Si/-Syu/-G/-R/-Q/-Qi/-Ql)
- 65 tests, 0 failures, clean build

Phase 1-5 native build tools (local/recipes/dev/):
- P1 Substrate: tar, m4, diffutils (gnulib bypass), mkfifo kernel patch (1085 lines)
- P2 Build Systems: bison, flex, meson (standalone wrapper), ninja-build, libtool
- P3 Native GCC: gcc-native, binutils-native (cross-compiled for redox host)
- P4 Native LLVM: llvm-native (clang + lld from monorepo)
- P5 Native Rust: rust-native (rustc + cargo)
- Groups: build-essential-native, dev-essential expanded

Config:
- redbear-mini: +7 tools (diffutils, tar, bison, flex, meson, ninja, m4)
- redbear-full: +4 native tools (gcc, binutils, llvm, rust)
- All recipes moved to local/ with symlinks for cookbook discovery (Red Bear policy)

Docs:
- BUILD-TOOLS-PORTING-PLAN.md: phased porting roadmap
- CUB-WORKFLOW-ASSESSMENT.md: gap analysis and integration assessment
2026-05-08 00:13:31 +01:00